LC100AH / 51.2 V 5.12 kWh LFP battery: Verify Battery, Power and Scope
Current source identity: LC100AH / 51.2 V 5.12 kWh LFP battery; released manufacturer table, BOM and project documentation are not attached.
This page defines a 51.2 V battery module route for the LC100AH / 51.2 V 5.12 kWh LFP battery. The current record is a sourcing identity, not a released manufacturer package. Final capacity, power, battery/BMS, PCS, HVAC, fire protection, controls, installation and warranty scope must be fixed by the exact model and project BOM.
- Configuration route
- LC100AH / 51.2 V 5.12 kWh LFP battery
- Supply layer
- 51.2 V battery module route
- Energy boundary
- Nominal value is not verified usable energy
- System boundary
- Exact BOM and project interfaces required
Current source-derived specifications
These values are preserved from the current product record. Read them with the configuration, compatibility, document and project boundaries below before using them in a quotation.
Battery & Energy
| Battery Format | Low-voltage lithium energy storage battery |
|---|---|
| Nominal Voltage | 51.2 V |
| Nominal Capacity | 100 Ah |
| Nominal Energy | 5.12 kWh |
| Recommended Current | 100 A BMS rated current |
| Cycle Life | >6,000 cycles |
System & Installation
| Installation | Confirm mounting method with the final supplier datasheet |
|---|---|
| Scalability | Confirm parallel operation, battery chemistry and inverter BMS protocol before order |
| Dimensions | 720 × 480 × 170 mm |
| Weight | 55.2 kg net weight |
Current document status
Request exact model/suffix, electrical and thermal table, cell/BMS/PCS/EMS schedule, enclosure/safety architecture, wiring/one-line, transport/certificates, warranty and full BOM before order release.
Current configuration evidence
Keep battery, rack, cabinet and project scopes distinct
A battery component, cabinet and container system have different electrical, safety and delivery boundaries.
Exact delivered layer
The current route is 51.2 V battery module route. Confirm whether cells, modules, rack, BMS, PCS, EMS, HVAC, fire system, transformer, switchgear and auxiliaries are included.
Energy and power
Confirm nominal and usable energy, continuous/peak DC and AC power, current, voltage window, C-rate, derating, auxiliary consumption and test basis.
Controls and safety
Confirm BMS/PCS/EMS/PPC interfaces, protocol/firmware, sensing, contactors, cooling, fire detection/suppression, alarms and fail-safe behavior.
Project and documents
Confirm enclosure/IP, foundations/civil, transport, installation, grid/utility studies, commissioning, FAT/SAT, warranty and responsibility matrix.
Storage RFQ checks
Six checks before finalizing storage scope
The final offer must define the exact equipment layer, operating duty and project interfaces.
Exact code and BOM
Request full model/revision, manufacturer, cell/module/rack or system BOM and supplied option schedule.
Energy and duty
State usable-energy target, power, duration, cycles, DoD, ambient, reserve, degradation and acceptance test conditions.
Electrical interfaces
Confirm battery voltage/current, PCS/AC voltage, protection, earthing, cable/terminal, transformer/MV where applicable and one-line.
Controls
Confirm BMS/PCS/EMS/PPC protocols, firmware, meters/CTs, remote access, cybersecurity, control permissions and commissioning.
Safety and site
Confirm thermal design, fire architecture, ventilation, enclosure, spacing, transport, civil works, emergency response and local approvals.
Evidence and commercial scope
Request test/certificate scope, manuals, warranty, spares, packing, lead time, FAT/SAT and substitution controls.
Storage boundaries
A kWh or MWh headline is not a complete storage-system guarantee
Usable energy, performance, safety and compliance depend on exact equipment, test conditions and project integration.
Nominal is not usable energy
Usable energy varies with DoD, power, temperature, ageing, reserve, BMS limits and auxiliary consumption.
Battery is not a complete ESS
A cell/module/rack route does not include PCS, EMS, HVAC, fire, AC/MV, enclosure, installation or commissioning unless explicitly listed.
Cabinet/container is not turnkey by default
Confirm every BOM layer, site/civil scope, grid interface, transformer/switchgear, transport, installation and acceptance responsibility.
Safety and approvals are site-specific
Do not infer destination fire, transport, grid or building approval from generic labels; verify exact model and project evidence.
Continue the storage review
Prepare an evidence-controlled storage RFQ
Use existing guidance to define the actual energy, power, interfaces and project delivery scope.
Storage RFQ FAQ
Questions to close before selecting a storage product
Exact model documents and project integration determine the final answer.
Is LC100AH / 51.2 V 5.12 kWh LFP battery a complete delivered system?
No. It is a battery-level route unless a complete system BOM explicitly includes the other equipment layers.
Can the nominal energy be used as usable project energy?
No. Confirm DoD, power, temperature, BMS limits, ageing, reserve, auxiliaries and the test basis.
Will it pair with any inverter or PCS?
No. Confirm voltage/current, BMS protocol, firmware, contactor/protection, approved compatibility and warranty for the exact pair.
What should the RFQ request?
Request exact model/BOM, electrical and thermal tables, controls, safety architecture, one-line, test/certificates, warranty, packing, FAT/SAT and project scope.
Prepare a verified LC100AH / 51.2 V 5.12 kWh LFP battery RFQ
Send energy and power duty, site/environment, AC/DC interfaces, controls, safety, grid and document requirements to define the exact scope.
Start with the product, application or project information you have. We can help identify the remaining configuration, document or delivery questions before a final quotation.
Verify Storage ScopeRelated Products

GLM-314 / GLM-280 Low-Voltage LFP Battery
16.08 kWh / 14.34 kWh low-voltage lfp battery for high-capacity residential storage and small commercial solar-plus-storage.

GLW-200 10.49kWh Low-Voltage LFP Battery
10.49 kWh low-voltage lfp battery for residential solar storage and backup-capable hybrid systems.

GLR-314 / GLR-280 / GLR-200 Rack LFP Battery
16.08 kWh / 14.34 kWh / 10.49 kWh rack-mount low-voltage lfp battery for residential multi-battery banks and light commercial backup storage.
View Details